The Municipality of Anchorage (MOA) Project Management & Engineering Department (PM&E) is preparing to begin construction of the Camrose Drive Storm Drainage Project. See map at the bottom for the project limits. Clearing is anticipated to be accomplished by late April 2024, and construction of the drainage improvements could begin as soon as mid-May, 2024. MOA will be represented by an on-site inspector during construction to ensure the quality of work and minimize inconveniences. The inspector will work with residents to try and accommodate any special property access needs. See Contact Us page for contact information.

Improvements will include: a new storm drain system within Camrose Drive and Derby Way, a new storm drain outfall south of E. Northern Lights Boulevard, replacement of the sewer main on Derby Way, new asphalt pavement, new road foundation, and new street lighting. Work will also include the abandonment and removal of the end of the pipes of two existing storm drain outfalls that discharge into the Southfork Chester Creek from Camrose Drive. The lower portions of driveways, adjacent to the curb, throughout the project area will be reconstructed to match the new roadway grades.  Additionally, all mailboxes along the project area will be replaced with new posts and mailboxes. The Contractor will be required to provide temporary mailboxes so that there is no interruption in mail service. Utility relocation work including natural gas, electric, telephone and cable facilities will also be occurring during construction.

How to be informed:

  • Sign up for e-mail updates, select the link on this page below to sign up.
  • Contact Us anytime with comments or questions.

Map of the Project Area